Pre-Feasibility Study 2018

Pre-feasibility study 2018 GME completed a 12 month Pre-Feasibility Study (PFS) in August 2018. The PFS presents a stand-alone development pathway for the NiWest Project that incorporates detailed consideration of: The results from the metallurgical test work and engineering conducted on the NiWest Project by GME over the past five years; A review of the … Continue reading Pre-Feasibility Study 2018